500 Ton Crane Rental · UAE-Wide

500 Ton Crane Rental in the UAE

500 ton mobile cranes are for the heaviest lifts in the UAE: process modules and columns at refineries and plants, bridge girders, large transformers, and erecting or dismantling tower cranes. A crane of this class is a project in itself, so every hire starts with an engineered lift plan, a site survey and a mobilization schedule for the crane, its counterweight and crew.

Get a Free Quote

Your details open in WhatsApp, ready to send.

500 TonRated Capacity
50–85 mTelescopic Boom
EngineeredLift Study
All 7 EmiratesCoverage

16+

Years in business, since 2010

420+

crane lifts completed

24/7

Breakdown replacement

Licences & Certifications

  • Licensed Abu Dhabi Company

    Seven Lift General Transport L.L.C., trading from Musaffah since 2010.

    Abu Dhabi Department of Economic Development
  • OSHAD-SF Lift Planning

    Lift plans, risk assessments, and permits to work prepared to the Abu Dhabi OSHAD framework.

    Abu Dhabi Public Health Centre (OSHAD)
  • Third-Party Inspected Fleet

    Cranes and lifting equipment carry current third-party inspection and load-test certificates.

    Accredited third-party inspection body

  • Certified Operators & Riggers

    Every operator and rigger holds a valid certificate for the machine class they run.

    Third-party operator certification

What a 500 Ton Crane Hire Involves

The headline figure applies only at very short radius. What a 500 ton crane offers is capacity at distance and height: a telescopic boom of roughly 50 to 85 m, and luffing jibs that take hook heights well beyond 100 m. That is how a heavy module can be set into a congested plant from outside the unit.

The crane travels on its own axles, but its counterweight, up to around 165 tonnes on the largest models in this class, comes on a convoy of trucks, and rigging the crane typically takes most of a day. Road movement permits, a route check and an assembly area are all part of the plan.

Outrigger loads at this size need an engineered ground assessment and load-spreading mats under each pad. We agree the setup position, the exclusion zone and the wind limits with your engineers before the crane mobilizes.

Typical 500 Ton Crane Specs (confirm per job)

Rated capacity
500 t, at very short radius only
Telescopic boom
Roughly 50 to 85 m
Hook height with luffing jib
Over 100 m
Outrigger spread
Roughly 10 m or more each way
Counterweight
Up to about 165 t on the largest models, by truck convoy
Booking
Weeks ahead, for planning, permits and mobilization

Typical 500 Ton Crane Jobs

  1. 1Process modules, columns and heat exchangers at refineries and petrochemical plants
  2. 2Bridge girder and precast segment lifts on infrastructure projects
  3. 3Large transformer and generator installation at power and utility sites
  4. 4Tower crane erection and dismantling on high-rise projects

What Affects the Price

  1. ✓Number of counterweight trucks and their travel distance
  2. ✓Assembly and dismantling time for the crane and jib
  3. ✓Engineering: lift study, ground assessment and rigging design
  4. ✓Load-spreading mats and ground preparation
  5. ✓Road movement permits and route surveys

Included With Every Crane Hire

  1. ✓Certified crane operator
  2. ✓Certified rigger and banksman to suit the lift
  3. ✓Lift plan, method statement and risk assessment to the site's safety framework
  4. ✓Current third-party inspection certificate and load chart
  5. ✓Insurance cover on the crane

Frequently Asked Questions

How much does it cost to hire a 500 ton crane in the UAE?+

Mobilization is a large share of the price: the counterweight convoy, assembly and dismantling, permits and the lift engineering, on top of the hire days. We quote after reviewing the lift details and surveying the site.

How long does it take to rig a 500 ton crane?+

Typically most of a day to fit the counterweight and any jib, and a similar time to dismantle. The lift plan schedules both, so the crane is ready when the load and your team are.

How far ahead should a 500 ton crane be booked?+

As early as possible, and usually weeks ahead. Send the lift details early so the site survey, lift study and road permits can run in parallel.

What information do you need to plan a 500 ton lift?+

The load weight and centre of gravity, its dimensions and lifting points, the lift radius and height, site drawings showing the setup area, ground information if available, and the site's HSE and permit requirements.

Do you mobilize 500 ton cranes to every emirate?+

Yes. We mobilize heavy cranes to sites across all seven emirates. The plan covers the route, the convoy and any movement permits from our yard to your site.

Planning a 500 Ton Lift?

Send the load data, site drawings and target date. We arrange the survey and an engineered lift plan for your approval.

Call NowWhatsApp